Beschreibung
Overview
The Yokogawa AFV30D‑S41151/HKU is a duplexed Field Control Unit (FCU) designed for the CENTUM VP distributed control system. Featuring dual redundant processors and communication paths, it ensures high-availability operation and uninterrupted process control. The /HKU option provides external monitoring outputs, allowing real-time health and fault status checks. It supports PID, sequence, logic, and batch control functions, making it ideal for large-scale process automation.
Key Features
-
Dual redundant CPU architecture and communication paths for fault-tolerant operation
-
Supports PID, sequence control, logic control, and batch processing
-
/HKU option provides READY contact and FCU fault outputs for external monitoring
-
Designed for continuous operation in critical process environments
Technical Specifications
Functional Parameters
| Item | Specification |
|---|---|
| Model | AFV30D‑S41151/HKU |
| Type | Duplex Field Control Unit (FCU) |
| System Compatibility | CENTUM VP |
| Control Functions | PID, Sequence Control, Logic, Batch Control |
| Redundancy | Dual CPU and communication paths |
| Diagnostics | READY output, HKU fault contact output |
Electrical Parameters
| Item | Specification |
|---|---|
| Power Supply Options | 100–120 V AC, 220–240 V AC, or 24 V DC |
| Power Consumption | 200–300 VA (AC), ~9 A (DC) |
| Memory Backup | Battery backup for main memory up to 72 hours |
| Battery Recharge Time | Minimum 48 hours |
| Contact Output Rating | 30 V DC, max. 0.3 A |
Mechanical Parameters
| Item | Specification |
|---|---|
| Dimensions | 482 mm (W) × 210 mm (H) × 220 mm (D) |
| Weight | 7 kg |
| Mounting | 19-inch rack mountable |
| Cooling | Natural convection |
| Construction | Industrial-grade enclosure with redundant slots |
Environmental Conditions
| Item | Specification |
|---|---|
| Operating Temperature | 0 °C to 55 °C |
| Storage Temperature | −40 °C to 70 °C |
| Humidity | 5–95% RH, non-condensing |
| EMC | Designed for high-noise industrial environments |
Applications
-
Oil & Gas process control
-
Petrochemical and chemical plants
-
Power generation and utility plants
-
Large-scale continuous process automation requiring high reliability
FAQ
Q: What control strategies does AFV30D‑S41151/HKU support?
A: It supports PID, sequence control, logic operations, and batch processing for large process automation systems.
Q: What does the /HKU option provide?
A: The /HKU option outputs READY and fault signals for external monitoring, enabling health status checks and remote diagnostics.
Q: Is this FCU suitable for high-reliability systems?
A: Yes, its dual redundant CPUs and communication paths ensure uninterrupted operation during hardware failures.
Q: Can it operate on multiple power sources?
A: Yes, it supports 100–120 V AC, 220–240 V AC, and 24 V DC, making it versatile for various installations.
Zeig mehr
Wir begrüßen Großbestellungen und haben eine Mindestbestellmenge von nur einer Einheit.
Auf Anfrage können wir alle notwendigen Dokumente bereitstellen, einschließlich Ursprungs-/Konformitätszertifikate und andere erforderliche Exportdokumente.
Für vorrätige Artikel streben wir eine Lieferung innerhalb von 1-3 Tagen nach Zahlungseingang an. Artikel mit angegebenen Lieferzeiten werden gemäß dem angegebenen Zeitplan geliefert.
Wir akzeptieren 100% T/T (Telegraphische Überweisung) Zahlung vor dem Versand. Für Artikel mit Lieferzeiten ist eine Anzahlung von 30% im Voraus erforderlich, der verbleibende Rest von 70% ist vor dem Versand fällig. Für RMB-Überweisungen kontaktieren Sie uns bitte, wenn Sie einen Agenten in China haben.
Wir bieten eine standardmäßige einjährige Garantie auf alle neuen und originalen Artikel. Wenn Sie eine erweiterte Garantie benötigen, kontaktieren Sie uns bitte für weitere Kostendetails.
Ihre Zufriedenheit ist uns wichtig. Wenn Sie einen Artikel zurückgeben müssen, muss dies innerhalb von 30 Tagen nach dem Bestelldatum erfolgen. Das Produkt muss unbenutzt, ungeöffnet und in der Originalverpackung mit allen Zubehörteilen sein. Rückerstattungen werden innerhalb von 5-7 Werktagen nach Erhalt des zurückgesandten Artikels bearbeitet. Bitte beachten Sie, dass Versand- und damit verbundene Gebühren nicht erstattungsfähig sind.